Skip to content

Manage assignment and plan states

States protect planning history. Use the available action rather than creating duplicate work or changing completed evidence.

Waqar assignment lifecycle showing draft review, publication, and preserved replacements

  • Draft: editable setup; an administrator can activate or cancel it.
  • Active: eligible for teaching and, when policy allows, rolling generation.
  • Paused: future automation stops; an administrator can resume, complete, or cancel it.
  • Completed: terminal plan history.
  • Cancelled: terminal plan history.

Only a school administrator changes a plan’s state. Pausing supersedes eligible unstarted generated future work but preserves started, completed, manual, and edited evidence.

  • Draft can be approved to Published, rejected, postponed to a supplied date, cancelled, edited through replacement, or regenerated when generated.
  • Published can become In progress through matched teaching activity, be postponed, cancelled, replaced, or regenerated when generated.
  • Postponed can be published again, postponed to a new date, cancelled, replaced, or regenerated when generated.
  • In progress advances from recorded outcomes; staff should not replace its evidence.
  • Completed, Rejected, Needs repeat, Superseded, and Cancelled explain preserved outcomes or history. The interface exposes only valid actions for the current state.
  1. Open the plan and review every segment and explanation.
  2. For one draft, choose Approve or Reject.
  3. For several reviewed drafts, select them and choose Approve selected.
  4. Confirm the resulting state. Publishing can notify eligible users and make the assignment visible in teaching or parent views.
  1. Enter Postpone until for a draft, published, or already postponed item.
  2. Choose Postpone.
  3. When it is ready, verify its range and choose Publish.
  1. For a draft, published, or postponed assignment, choose Edit assignment.
  2. Review the warning that the original will remain in history.
  3. Correct the date, ordered segments, explanation, or staff notes.
  4. Choose Save as draft or Save and publish.
  5. Verify View replacement links the old record to the new one.

The original becomes Superseded. Never use replacement to conceal work already assessed. See replanning for plan-wide future changes.